Everything Totally Explained


Ask & we'll explain, totally!
Burj Dubai
Totally Explained


  NEW! All the latest news in the worlds of computer gaming, entertainment, the environment,  
finance, health, politics, science, stocks & shares, technology and much, much, more.  


View this entry using RSS

Everything about Burj Dubai totally explained

Burj Dubai ("Dubai Tower") is a skyscraper under construction in Dubai, United Arab Emirates, and is the tallest man-made structure on Earth. Construction began on September 21, 2004, and it's expected to be completed and ready for occupation in September 2009. who worked with Skidmore, Owings and Merrill (SOM) until 2006. SOM is the architecture and engineering firm in charge of the project. Turner Construction Company was chosen as the construction manager.
   The total budget for the Burj Dubai project is about US$ 4.1 billion and for the entire new 'Downtown Dubai', US$ 20 billion. Mohamed Ali Alabbar, the CEO of Emaar Properties, speaking at the Council on Tall Buildings and Urban Habitat 8th World Congress, said that the price of office space at Burj Dubai had reached $4,000 per sq ft and that the Armani Residences, also in Burj Dubai, were selling for $3,500 per sq ft.

Height

Current height

As of 12 May 2008, Burj Dubai has reached a height of, with more than 160 completed floors.
   Burj Dubai's final milestone will be to surpass the Warsaw radio mast in Konstantynów near Gąbin, Poland (which stood at until it collapsed in 1991) to become the world's tallest structure of any type ever built.

Timeline of events

  • September 21 2004
    Emaar contractors begin construction of Burj Dubai.
  • February 2007
    Burj Dubai surpasses the Sears Tower as the building with the most floors.
  • May 13 2007
    Burj Dubai sets record for vertical concrete pumping on any building at, surpassing the to which concrete was pumped during the construction of Taipei 101.
  • July 21 2007
    Burj Dubai surpasses Taipei 101 which stands at a height of and was the tallest building on Earth. The previous day, the head of the Council on Tall Buildings and Urban Habitat (CTBUH), Antony Wood, had confirmed that it "surpassed the height of Taipei 101 structurally (concrete)." However, he also added "We won't classify it as a building until it's complete, clad and at least partially open for business to avoid things like the Ryungyong [sic] project. Taipei 101 is thus officially the world's tallest until that happens."
  • August 12 2007
    Burj Dubai surpassed the height of the Sears Tower antenna which stands at a height of .
  • September 3 2007
    Burj Dubai becomes the second-tallest freestanding structure, surpassing the Ostankino Tower in Moscow.
  • September 12 2007
    At, Burj Dubai becomes the world's tallest freestanding structure on land, surpassing CN Tower in Toronto.
  • April 7 2008
    Emaar announces that the Burj Dubai, at, has surpassed the KVLY-TV Mast to become the tallest man-made structure on earth.

Current records

  • Tallest structure: (previously KVLY-TV mast - )
  • Tallest freestanding structure: (previously CN Tower - )
  • Building with most floors: 164 (previously Sears Tower / World Trade Center - 110)
  • Highest Vertical concrete pumping (for a building): (previously Taipei 101 - )
  • Highest Vertical concrete pumping (for any construction): (previously Riva del Garda Hydroelectric Power Plant - ) Note: Additional records for tallest skyscraper are considered unofficial, as the CTBUH doesn't recognize records for buildings still under construction.

    Projected height

    The projected final height of Burj Dubai is officially being kept a secret due to competition from other buildings under construction or proposed; however, figures released by a contractor on the project have suggested a height of around . Based on this height, the total number of habitable floors is expected to be around 162. However, the Burj Dubai's construction manager, Greg Sang, has said only that the final height would be greater than, and that it would be the world's tallest free-standing structure when completed.

    History of height increases

    Though unconfirmed, Burj Dubai has been rumoured to have undergone several height increases since its inception. Originally proposed as a virtual clone of the Grollo Tower proposal for Melbourne, Australia's Docklands waterfront development, the tower was redesigned with an original design by Skidmore Owings and Merrill seen above and discussed below. This design should put it at approximately . Contradictory information abounds regarding the official height of the building, which is to be expected, considering the building seeks to acquire the designation as the world's tallest structure upon completion in 2009. One website mentions a rumoured final height of in a September 28, 2006 posting, but this is contradicted by a September 20, 2006 article listing a height over .
       The design architect, Adrian Smith, felt that the upper-most section of the building didn't culminate elegantly with the rest of the structure, so he sought and received approval to increase it to the currently planned height. It has been explicitly stated that this change didn't include any added floors, which is fitting with Smith's attempts to make the crown more slender. However, the top of the tower will be a steel frame structure, unlike the lower portion's reinforced concrete. The developer, Emaar, has stated this steel section may be extended to beat any other tower to the title of tallest; however, once the tower is complete, height increases won't be recognised.

    Competition with other projects

    Several other major projects in the region may vie for the title of tallest structure. These other projects are in various states of planning and/or construction:
  • One of Burj Dubai's potential competitors is the proposed Murjan Tower, in Manama, Bahrain. Designed by the Danish architects Henning Larsens Tegnestue A/S, it's expected to be in height with 200 floors.
  • Also potentially competing with Burj Dubai is the proposed Burj Mubarak al-Kabir to be erected in Kuwait as part of a massive development project called Madinat al-Hareer (City of Silk). The project also includes an Olympic stadium, residences, hotels, and retail facilities. However, the project may take 25 years to complete.
  • Another proposed tower which may surpass the height of Burj Dubai, is Al Burj, on a site near Dubai Marina. Speculation has suggested various heights between and, but the developer is keeping the final height tightly under wraps. If built, it'll be only from the Burj Dubai site.
  • The Mile-High Tower, a recently announced skyscraper planned for Jeddah, Saudi Arabia, would be almost twice as tall as Burj Dubai if completed as planned by Riyadh-based Kingdom Holdings.

    Architecture and design

    The tower is designed by Skidmore, Owings and Merrill, who also designed the Sears Tower in Chicago and the Freedom Tower in New York City, among numerous other famous high-rises. The building resembles the bundled tube form of the Sears Tower, but isn't a tube structure. The design of Burj Dubai is reminiscent of the Frank Lloyd Wright vision for The Illinois, a mile high skyscraper designed for Chicago, Illinois. Burj Dubai is expected to rise to 150% of the height of the Sears Tower. Emaar has also engaged GHD, an international multidisciplinary consulting firm, to assist with the design, review and assessment involved in the construction process.
       The design of Burj Dubai is ostensibly derived from the patterning systems embodied in Islamic architecture, with the triple-lobed footprint of the building based on an abstracted version of the desert flower hymenocallis native to the region. The tower is composed of three elements arranged around a central core. As the tower rises from the flat desert base, setbacks occur at each element in an upward spiralling pattern, decreasing the cross section of the tower as it reaches toward the sky. At the top, the central core emerges and is sculpted to form a finishing spire. A Y-shaped floor plan maximizes views of the Persian Gulf. Viewed from above or from the base, the form also evokes the onion domes of Islamic architecture. During the design process, engineers rotated the building 120 degrees from its original layout to reduce stress from prevailing winds. The tower, at its tallest point, sways a total of 3.35 metres (9.3ft).
    The exterior cladding of Burj Dubai will consist of of reflective glazing, and aluminium and textured stainless steel spandrel panels with vertical tubular fins. The cladding system is designed to withstand Dubai's extreme summer temperatures.
       The interior will be decorated by Giorgio Armani. An Armani Hotel (the first of its kind) will occupy the lower 37 floors. Floors 45 through 108 will have 700 private apartments on 64 floors (which, according to the developer, sold out within eight hours of going on sale). An outdoor zero-entry swimming pool will be located on the 78th floor of the tower. Corporate offices and suites will fill most of the remaining floors, except for a 123rd floor lobby and 124th floor (about ) indoor/outdoor observation deck. The spire - itself over tall - will hold communications equipment.
       It will also feature the world's fastest elevator, rising and descending at . The world's current fastest elevator (in the Taipei 101) travels at . Engineers had considered installing the world's first triple-decker elevators, but the final design calls for double-deck elevators. which also built the Petronas Twin Towers and the Taipei 101.
       The primary structural system of the Burj Dubai is reinforced concrete. Over of concrete, weighing more than were used to construct the concrete and steel foundation, which features 192 piles buried more than deep.
       Special mixes of concrete are made to withstand the extreme pressures of the massive weight of the tower; each batch of concrete is tested and checked to see whether it can withstand certain pressures. The head of Concrete Quality Checking on the Burj Dubai project is Alam Feroze, who is in charge of concrete on the whole project. The concrete pumps, pipelines and booms are provided by Putzmeister AG, of Aichtal, Germany.
       The consistency of the concrete on the project is essential. It was difficult to create a concrete that could withstand the thousands of tonnes bearing down on it and also withstand Gulf temperatures that can reach . To combat this problem, the concrete isn't poured during the day. Instead, ice is added to the mixture and it's poured at night when it's cooler and the humidity is higher. A cooler concrete mixture cures evenly throughout and therefore is less likely to set too quickly and crack. Any significant cracks could put the whole project in jeopardy.
       The unique design and engineering challenges of building Burj Dubai, have been featured in a number of TV documentaries, including the "Big, Bigger, Biggest" series on the National Geographic Channel in the USA, and Five in the United Kingdom, and the "Mega Builders" series on the Discovery Channel.

    Labour controversy

    Burj Dubai is being built primarily by immigrant engineers and workers from Pakistan, India, Bangladesh, China and the Philippines. Unions were forbidden in the United Arab Emirates up until recently, when the government announced steps to allow construction unions. On March 21, 2006, workers upset over low wages and poor working conditions rioted, damaging cars, offices, computers, and construction equipment. A Dubai Interior Ministry official said the rioters caused approximately US$1m in damage. Most workers returned the following day but refused to work. Workers building a new terminal at Dubai International Airport also joined that day's strike action.
       The United Arab Emirates dirham's close connection with the low US Dollar, and the increased cost-of-living in the region, has made it increasingly difficult for immigrant construction workers to survive on their wages. An offer by the UAE government in June 2007 to fly home illegal immigrant workers free-of-charge, with no questions asked, was met with overwhelming demand, further threatening the supply of workers on the Burj Dubai and other Dubai construction projects.

    Purpose

    Burj Dubai has been designed to be the centerpiece of a large-scale, mixed-use development that will include 30,000 homes, nine hotels such as the Burj Dubai Lake Hotel & Serviced Apartments, of parkland, at least 19 residential towers, the Dubai Mall, and the man-made Burj Dubai Lake.
       The silvery glass-sheathed concrete building will give the title of Earth's tallest free-standing structure to the Middle East — a title not held by the region since 1311 AD when Lincoln Cathedral in England surpassed the height of the Great Pyramid of Giza, which had held the title for almost four millennia.
       The decision to build Burj Dubai is reportedly based on the government's decision to diversify from a trade-based economy to one that's service- and tourism-oriented. According to officials, it's necessary for projects like Burj Dubai to be built in the city to garner more international recognition, and hence investment. "He [Sheikh Mohammed bin Rashid Al Maktoum] wanted to put Dubai on the map with something really sensational," said Jacqui Josephson, a tourism and VIP delegations executive at Nakheel Properties.

    Gallery

    Image:Burj2.jpg|
    2006-02-01
    Image:20060829_Burj_Dubai.jpg|
    2006-08-29
    Image:84floors.jpg|
    2006-11-11
    Image:Burjdubaijanuary07.jpg|
    2007-01-02
    Image:Burjdubaifeb2107.jpg|
    2007-03-21
    Image:Burjdubaimay07.jpg|
    2007-05-07
    Image:Burj.jpg|
    2007-07-15
    Image:Burjdubaiaug92007.jpg|
    2007-08-09
    Image:Burjdubai oct07.jpg|
    2007-10-14
    Image:Burj1217.jpg|
    2007-12-17
    Image:Burj Dubai in Skyline on 24 December 2007.jpg|
    2007-12-24
    Image:BurjDubai080203.JPG|
    2008-02-03
    Image:Burjdubai20feb.jpg|
    2008-02-20
    Image:Burj_dubai_3.11.08.jpg|
    2008-03-11
    Image:Brj Duba from jaber.jpg|
    2008-04-10
    Further Information

    Get more info on 'Burj Dubai'.


    External Link Exchanges

    Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:

      <a href="http://burj_dubai.totallyexplained.com">Burj Dubai Totally Explained</a>

    Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
       As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned.



  • Copyright © 2007-8 totallyexplained.com | Licensed under the GNU Free Documentation License | Site Map
    This article contains text from the Wikipedia article Burj Dubai (History) and is released under the GFDL | RSS Version